From design qualification to site acceptance, we provide a structured process to verify that your system is built, installed, and operated according to defined requirements.

Compliant

Safe

Reliable

Production Ready
Qualification Lifecycle
A structured qualification process that verifies system design, installation, operation, and performance
From
Functional Specification
Site Acceptance.
01 — Functional Specification (FS)
Define system functions, process requirements, control philosophy, and user requirements.
02 — Design Qualification (DQ)
Verify that the proposed system design meets specified functional, technical, and regulatory requirements.
03 — Factory Acceptance Test (FAT)
Test and verify system functionality, controls, alarms, and documentation before shipment to site.
04 — Installation Qualification (IQ)
Verify that equipment, piping, electrical, instrumentation, and supporting systems are installed according to approved specifications and drawings.
05 — Operational Qualification (OQ)
Confirm that the system operates correctly across defined operating conditions and control sequences.
06 — Performance Qualification (PQ)
Support performance verification to demonstrate that the system consistently performs according to defined process requirements.
07 — Site Acceptance Test (SAT)
Final verification at site to confirm system functionality, integration, and readiness for operation.