Test run and commissioning will be executed in the following procedure:
- cleaning the plant
- dry run test to inspect the integration of equipment, rotation of motors, etc.
- water test simulates the production by using water as media
- product test run the plant with the actual material as the production being.
- taking-over test shall be carried out in the presence of the Client and INTEGRA, or their authorized representatives.